Crusher run calculator for Alaska
A pavement-style base layer figured at its final compacted thickness, not as loose material.
Enter your project dimensions
After compaction, crusher run tightens by 10-15% from its loose truck condition. Ordering only to the measured depth can leave the finished base half an inch short, so the calculator has a +10% allowance turned on. This material may be listed as Pit Run, bank run, unscreened gravel in Alaska, or 2 inch minus on some tickets. Each name describes crushed stone with fines included, about 3,000 lb per cubic yard, that compacts into a firm surface under tires.
Order for compacted depth
- Find the footprint in feet. Multiply lane length by width, or measure the pad dimensions.
- Choose the required finished compacted depth: 4 inches for paths and pavers, 4-6 for driveways, and 6-8 for trucks.
- For yards, divide cubic feet by 27. Multiply that result by 1.5 for tons, and leave the +10% selected. Specifications list the depth after rolling.
Tons of coverage
| Compacted depth | 1 cubic yard covers | 1 ton covers |
|---|---|---|
| 2 inches | 162 sq ft | ≈ 108 sq ft |
| 4 inches | 81 sq ft | ≈ 54 sq ft |
| 6 inches | 54 sq ft | ≈ 36 sq ft |
| 8 inches | 41 sq ft | ≈ 27 sq ft |
Best uses and limits
- For driveway bases, use 4-6 inches after compaction. Add 2-3 inches of #57 or driveway gravel as the driving surface.
- Budget rural lanes can use crusher run as the driving layer. Plan for summer dust and regrading every 2-4 years.
- Paver and slab bases use 4 inches compacted in 2-inch lifts. The Paver Base Calculator covers the complete paver stack.
- Use 4 inches for shed and hot-tub pads over stripped ground, or 6 on soft soil.
- Keep it out of French drains. The fines help it bind but also retain water. Use clean #57 or drain rock for drainage.
Example: a 20 x 10 parking pad
For 200 square feet at a compacted 4 inches, calculate 200 x 0.333 = 67 cubic feet = 2.5 cubic yards, or 3.7 tons. Order 4 tons to cover the allowance. Place and compact half the material, then place and compact the remainder. Two 2-inch lifts hold up longer than a single 4-inch layer. During breakup season, use a plate compactor to help limit ruts.
Delivery guidance
- Have the base and surface stone delivered together to keep the project timeline moving. Delivery is free either way.
- Dump at the far end first, then work back toward the pile. On large pads, working downhill instead of uphill saves a full day.
- Lightly mist each lift before compaction. Moist crusher run packs tighter than dry material.
- Set aside a wheelbarrow-load for later. The material also works for pothole patches, and repairs will be needed.
Pricing details
Crusher run is made from crusher output rather than washed, sorted stone. On a 4-ton order, the +10% allowance can avoid a separate half-ton delivery. Check the Crusher Run product page for the per-ton price, compare Road Base, and order both driveway layers in one free delivery.
Crusher run, Pit Run, bank run, and unscreened gravel FAQs
How much crusher run is needed for a driveway?
What does a yard of crusher run weigh?
How is crusher run different from gravel?
Are crush and run and crusher run the same?
Can crusher run serve as the final surface?
How much will crusher run shrink during compaction?
More calculators
Base material selected
Order crusher run by the ton with free delivery.