Paver base calculator for Alaska
The below-grade layer that keeps a patio level years later, calculated by tons at its compacted depth.
Enter your project dimensions
The stone beneath the pavers costs far less per square foot, but it is usually where a failed patio begins. Problems that show up at the surface commonly start in the support layer below. Use this calculator to size compacted crusher run or a comparable blend at 1.5 tons per cubic yard: 4 inches for foot traffic and 6-8 for vehicles, with the +10% compaction allowance selected automatically. Bedding sand is calculated separately as a firm 1-inch layer.
Base sizing
- Start with the paved dimensions in feet. Allow the base to run 6 inches beyond each unclosed paver edge so the edge restraint has solid support.
- Use a compacted depth of 4 inches for patios and walkways, 6 for driveways or clay soil, and 8 for driveways over soft ground.
- Divide cubic feet by 27 for yards; multiply by 1.5 for tons; then switch on the +10% allowance.
Excavation depth = base + 1" bedding + paver thickness − reveal
Project depth and coverage
| Project | Compacted base depth | 1 ton covers |
|---|---|---|
| Walkway or garden path | 4 inches | ≈ 54 sq ft |
| Patio or seating area | 4-6 inches | ≈ 43 sq ft |
| Driveway with cars | 6-8 inches | ≈ 31 sq ft |
| Clay or soft subgrade | add 2 inches + fabric | n/a |
Layers from turf to the finished paver
Add the thickness of every layer to determine excavation. For a standard patio, that is 4 inches of base, 1 inch of bedding sand, and a 2 3/8 inch paver set even with the lawn. Plan on a 7.5-inch dig, adjusted for the reveal wanted above grade. Put the depth on a stake and keep checking while excavating. Digging too deep means paying to remove extra soil, which the Dirt Calculator can estimate in reverse, then buying more stone to replace it.
Installation practices for a stable base
- Install the base in 2-inch lifts, compacting each with a plate compactor and a light mist. Slightly damp material packs more tightly than dry material.
- Build the final base with a 2-3% pitch leading away from the house. Sand and pavers will take on the same slope.
- The edge restraint belongs over firm, compacted base, not lawn soil. The 6-inch base extension gives it that bearing.
- For clay ground, place woven geotextile beneath the base. It keeps stone from gradually sinking into the subgrade through wet seasons.
- Base thickness cannot be replaced with a deep sand layer. Sand shifts, and that shortcut leads to uneven paver surfaces.
Re-laying existing pavers: checking the base
When re-laying a patio, the existing base can sometimes remain. Take up the pavers, remove the old bedding sand, and check the layer below. A base that is level, firm, and draining can receive a new 1-inch bedding layer, reducing the stone order to a tenth of a new installation. Remove the base where dips, soft ground, or pooled water are present. Leaving a failed layer in place puts the same issue under the replacement pavers.
Example: a 16 x 12 patio
The paved area is 192 square feet. Adding the 6-inch overhang along three open sides makes the base footprint 210. For 4 inches of compaction, calculate 210 x 0.333 = 70 cubic feet = 2.6 cubic yards, or about 3.9 tons and 4.3 with the allowance. Order 4.5 tons of crusher run and 0.9 tons of bedding sand from the Paver Sand Calculator in one free delivery. Schedule the drop after excavation, since a stone pile sitting on grass for two weeks can leave a dead rectangle.
Questions on base depth, digging, and tonnage
How can I calculate the paver base quantity?
Will 2 inches of paver base work?
What depth of base do pavers need?
What excavation depth is needed for pavers?
For paver base, crusher run or screenings?
Can pavers go down without a base?
More calculators
Pavers finish the surface. Base supports it.
Order crusher run and screenings by the ton with bedding sand, including free delivery.