Rip rap calculator for Alaska

Calculate shoreline and slope quantities by installation depth, since armor stone is set far deeper than landscaping rock.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

Expect one ton of riprap to cover about 17 square feet. That is accurate. Armor stone is installed in layers 12 inches or thicker, so each ton covers about a tenth of the area landscaping rock can cover. The pile often seems small beside the bank it must hold. This calculator bases quantities on layer depth, using 3,100 lb per cubic yard for stone commonly 4 to 12 inches and larger.

How to measure an armor bank

  1. Take measurements on the sloped face rather than level ground: tape down the slope, then multiply that distance by the shoreline or channel length.
  2. Set the rock course at 1.5 to 2 times the diameter of the biggest stones. For erosion work that holds up, do not go below 12 inches.
  3. To find cubic yards, take cubic feet / 27; then use x 1.55 to calculate tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Tons of coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

Stone placement rules

  • Put the base in before the riprap: lay non-woven geotextile beneath it, or use 3-4 inches of #4 stone. Rock placed straight on soil may look sound for one season, then settle when erosion removes support below.
  • Start by setting a buried toe. The first course needs to sit below the waterline or anticipated scour depth, since undermining begins at the bottom.
  • Prepare a 2:1 slope or flatter ahead of rock placement. A bank steeper than that calls for engineering rather than extra stone.
  • Use equipment or hand setting on the exposed top course, arranging stones to lock together instead of leaving them where they land.
  • Extend the outlet apron 4-6 pipe diameters beyond a culvert. The downstream end is where flowing water cuts into the ground.

Example: 50 feet of pond bank

For 50 feet of shoreline with a 6-foot slope face, plan on 300 square feet of coverage. An 18-inch-deep layer works out to 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, or roughly 26 tons of riprap. Make it 27 to cover the small allowance. Put down a roll of geotextile, or use about 4 tons of #4 stone for a rock bedding layer. Check the access route before placing the order. A loaded truck can sink along the final 20 feet to the pond edge, and handling the stone twice doubles the cost.

Following the first major storm

After the water goes down, make a pass along the bank. Check the toe for displaced rock, exposed soil in the gaps, visible fabric, and scouring at the outfall apron. Put shifted pieces back in place and use reserve stone to fill light areas. Ten minutes a couple of times each year covers the maintenance, including after freeze-thaw movement: riprap is meant to carry the protection load itself.

Stone size classes

Select stone for the force of the water. Four to eight inch riprap fits pond banks, slow streams and downspout outfalls. Use eight to twelve for lake edges exposed to boat wake and for faster channels. Engineered jobs such as highways and spillways use their own stone classes and layer thicknesses, so follow the drawing instead of this page. If the choice is between sizes, use the larger material and a thicker layer. Added weight gives more forgiveness.

Riprap quantity, size, and placement

How can I calculate the rip rap I need?
Calculate slope-face area, multiply by thickness in feet, then divide by 27 and multiply by 1.55. On a 10 x 10 trial section at 12 inches, that comes to 37 cubic feet, or about 2.1 tons.
What area will 1 ton of riprap cover?
Coverage is roughly 17 square feet at 12 inches deep and 12 square feet at 18 inches. For a budget figure, use 5.5 to 6 tons per 100 square feet at the standard layer.
How much space does 1 ton of rip rap take up?
One ton forms a pile close to two-thirds of a cubic yard, about as much volume as a washing machine. With 6-8 inch rock, that is typically 25-35 pieces. Spread to the required depth, it protects a 4 x 4 section of bank.
What is the price of 1 ton of rip rap?
RipRap is priced above construction stone, with cost based on size class. Check our RipRap product page for the current amount; delivery is free. Fabric and bedding stone add a fraction more, and both help support the rock system.
What layer thickness does rip rap need?
Plan for one and a half to two times the largest rock size, never less than 12 inches. Residential 4-12 inch stone commonly uses 12-18 inches, while larger material or swift water calls for 24.
Is hand placement an option for rip rap?
Hand setting is practical for rock up to about 6-8 inch if you have gloves and a strong back, but a ton still means 25-35 lifts. Move to equipment for bigger rock. A skid steer can place in an hour what a crew may hand-set in a day.

Plan the bank protection.